Saturday, June 18, 2011

Smiley House 2nd Floor "Before" Pictures

The first step in the remodeling process will include a thorough cleaning, priming, and trim coat. That will be followed by electrification. Wallpaper and flooring will be installed in the final step.

The laundry room, shown at the left will require an extra step or two since the siding is showing on the interior wall. I suspect we'll create a faux wall to cover it before applying the wallpaper.

The second floor has four rooms, which the homeowners decided to use as laundry room, bedroom, bathroom, and master bedroom.



The bathroom is essentially a blank slate, which will receive a coat of primer then a lovely blue pattern paper and tile floor.



Currently an unfinished fiberboard material, the floors will be covered with red oak hardwood flooring sheets.